Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | 1year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Electricity | single phase (elec.) 220VAC, 50/60Hz, 20A, 1.5kw |
Power | 1.35kw |
Turntable Diameter | Φ1800mm |
Product Spec | L1100-1200*W1000-1100*H1000-1500MM (Including cardboard height) |
Effective winding height | 2100mm;The top of the product is not wrapped |
Column Height | 2500mm |
Wrap efficiency | 20-40 pallets/hour |
Turntable Height | 90mm |
Turntable Load Capacity | 2000kg |
Packaging material | LLDPE stretch film, thickness: 17-30μm, width: 500mm, inner roll: 76.2mm, max. outer roll diameter: 260mm. |
Performance | Winding machine with automatic film loading and breaking, with pre-tensioning device, with ramp plate |
Turntable speed | 0-15 RPM, slow start and stop, frequency conversion speed control |
PLC | The machine can be programmed to control the operation of the whole machine, the number of winding layers and times |
Remote Control | Remote control start or stop |
Lifting Mechanism | Frequency conversion speed control, adjustable rising and falling speed of membrane frame, double chain drive, safe and stable. |
Membrane system | Film frame power pre-stretching mechanism, pre-stretching up to 250%, effective saving stretch film, the film feeding speed control system, film tensioning strength can be adjusted. The film system follows the structure of the machine, safe and convenient |
Configuration | PLC adopts Panasonic; frequency converter adopts Delixi/China; proximity switch adopts Chande; motor and reducer adopts TCG; photoelectric switch adopts OMRON; low-voltage switch adopts Astronergy; columns and mold frame part adopts the surface treatment of spraying antirust paint and then plastic spraying. |
Product Color | dark or deep green |
Q1.How about product packaging?
A:Before the product is shipped, it will bepacked Plywood box plus bottom tray(wooden tray or steel tray).
Q2. What is your terms of delivery?
A: EXW, FOB, CIF...
Q3.How about your payment term? What kind of payment term you can accept?
A:As usual, the payment term is TT,30% deposit, the balance after machine testing and before delivery.
Q4. How about your delivery time?
A: Generally, it will take 15-20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5.How to answer technical guidance?
A:We will provide solutions based on theirspecific requirements, combined withtechnical feasibility and production costs.
Q6.How about the product transportation?
A:Products are generally shipped fromShenzhen Port, China to the destination portby sea.